Manufacturing

Paramount Textile to invest in 100-MW solar project in Bangladesh

Paramount Textile to invest in 100-MW solar project in Bangladesh

Paramount Textile Ltd (PTL) a Bangladesh based apparel company has decided to invest a 100-MW solar project in Bangladesh by purchasing a 49% stake in Dynamic Sun Energy Private Ltd.

The fabrics maker said in a bourse filing last week it will embark on the project in a bid to diversify its business.

For that purpose, PTL will form a joint venture to co-develop the project with Dynamic Sun, whose largest shareholder is India’s Shapoorji Pallonji Infrastructure Capital Co.

The photovoltaic (PV) park is set to be installed at a total cost of some BDT 13 billion (USD 153.1m/EUR 141.6m).

It will be located in the Pabna district in northwestern Bangladesh and will be connected to the national power grid. Its output will be sold at a tariff of USD 0.1195 (EUR 0.1111) per kWh under a 20-year contract.

Related posts

Hot Air Sealing Machines For PPE Kit By HNS

Perfect Sourcing Newsdesk

Apparel Park is now open in Indian state Kerala

Perfect Sourcing Newsdesk

New RoSCTL scheme by textile ministry

Perfect Sourcing Newsdesk

Leave a Comment